on ZPMC
West Gate Tunnel: A New Melbourne Landmark by ZPMC
The West Gate Tunnel in Melbourne, Australia, opened on December 14, 2025. Shanghai Zhenhua Heavy Industries Co., Ltd. (ZPMC) played a crucial role in this significant infrastructure project. The tunnel aims to create 6,000 jobs and reduce commute times by 20 minutes between Melbourne's western suburbs and the central business district.
The project includes highway widening, tunnel construction, and bridge crossings. ZPMC supplied 41,500 tonnes of steel for various structures. The steel met Australian Standards and technical specifications, ensuring high quality. Advanced technologies like 3D modelling helped overcome design and manufacturing challenges.
Successfully completed, the West Gate Tunnel marks ZPMC's entry into the Australian market, expanding their global steel structure business.
R. E.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all ZPMC news