BRIEF

on Tocvan Ventures Corp (CVE:TOC)

Tocvan Commences Trenching for Pilot Mine and Advances Infrastructure

Tocvan Ventures Corp has initiated trenching materials for its Pilot Mine at Gran Pilar South Block after securing local community approval. Site preparation is underway, including clearing areas for heap leach pads and containment ponds. These developments support their fully permitted 50,000-tonne facility.

Infrastructure enhancements include dozer cuts for channel sampling and ground leveling for equipment and roads, aligning with the ongoing exploration efforts in the North Block. Positive surface sampling and maiden drilling suggest promising gold and silver prospects.

Results from the North Block's maiden drill are anticipated early next year, as continuous sampling exposes new areas in both the North and South Blocks.

Tocvan remains dedicated to fulfilling its systematic exploration, upholding safety, environmental responsibility, and community benefits throughout the Gran Pilar Project.

R. E.

Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Tocvan Ventures Corp news