on Silver X Mining Corp. (CVE:AGX)
Silver X Mining Corp. Achieves Record Quarterly Production in Q2 2026
Silver X Mining Corp. reported a significant increase in production during the second quarter of 2026 at its Nueva Recuperada property in Peru. Processed tonnage rose 39% quarter-over-quarter and 78% year-over-year, reaching 62,252 MT. This was due to the plant maintaining its nominal capacity of approximately 750 MT per day throughout the quarter.
The company saw a 55% increase in gold production and a 40% rise in silver output compared to the previous quarter. This resulted in 175,560 oz of processed silver and 2,204 oz of gold. Overall production of silver equivalent ounces (AgEq) reached 380,436 oz, with 283,029 oz produced, indicating a robust performance boost.
The company's underground development also expanded to 3,159 metres, enhancing mining access and supporting continuous growth. Silver X aims to reach approximately 6 million AgEq ounces annually by 2029, with ongoing investments in mining and processing capabilities.
R. E.
Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Silver X Mining Corp. news