on Dateline Resources Limited (NASDAQ:DTREF)
Dateline Resources Reports Positive Drill Results at Colosseum Project
San Bernardino, California - Dateline Resources Limited has announced promising drilling results from its Colosseum Gold and Rare Earth Element Project. The recent reverse circulation holes in the North Pit have shown gold assay results surpassing the existing mineral resource grade for the intercepted blocks. This outcome is expected to enhance the mineral resource grade in surrounding areas, pending a new resource estimate in early 2026.
Key findings highlight significant gold intercepts, affirming the continuity of mineralization at depth. Hole RC25-001 demonstrated an intercept of 64.0 meters at 1.24 g/t Au from the surface, with high-grade zones identified. Meanwhile, RC25-004 revealed a broad intercept of 132.58 meters at 0.95 g/t Au, with notable high-grade sections.
These outcomes have returned higher grades than estimated for the Indicated mineral resource blocks. Drilling will resume post-Thanksgiving, aiming to further define the resource base and enhance the project's feasibility.
R. E.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Dateline Resources Limited news