BRIEF

on Banyan Gold Corp. (CVE:BYN)

Banyan Gold Reports High-Grade Gold Intersections at Yukon Project

Banyan Gold Corp. has announced promising drilling results from its Powerline Deposit at the AurMac Project in Yukon, Canada. A standout result from drillhole AX-26-891 shows an impressive 149.14 grams per tonne (g/t) of gold over 0.4 meters, within a wider interval of 0.56 g/t gold over 169.2 meters. Another significant finding from drillhole AX-26-892B includes 1.05 g/t gold over 52.8 meters. These results highlight the potential to enhance the grade and continuity of mineralized domains in the area.

The ongoing 2026 drill program aims to convert, expand, and delineate higher-grade mineralized domains. Other notable intersections include AX-26-878 with 1.37 g/t gold over 11.8 meters, and AX-26-876, showing 1.15 g/t gold over 13.9 meters. The data supports the company's strategy of targeting high-grade domains to improve the AurMac resource's grade profile and confidence.

R. P.

Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Banyan Gold Corp. news